Submitted By: Public Works
Prepared By: Ryan Kim, Senior Civil Engineer
Zak Ponsen, Assistant City Engineer
Dave Rebensdorf, Public Works Director/City Engineer
Subject:
title
CONSIDERATION OF A RESOLUTION AMENDING MASTER TRAFFIC RESOLUTION NO. 1846 FOR SIGNAGE AND STRIPING MODIFICATIONS AT THE INTERSECTION OF CALLE COLINA, CALLE SACRAMENTO AND AVENIDA HACIENDA FROM A YIELD CONDITION TO A STOP SIGN CONDITION, AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
body
Summary:
This report presents the findings and recommendations to modify the intersection of Calle Colina, Calle Sacramento, and Avenida Hacienda from a Yield condition to a Stop condition. The project includes new signage and striping to help improve safety for pedestrians, cyclists, and vehicles. See Attachment 2 for the proposed modifications.
Background:

Staff was notified of a safety and limited sight-distance issue when crossing or turning at the Calle Colina and Calle Sacramento intersection. In response, staff conducted a Stop Control Warrant (Attachment 3) and a field investigation to analyze the intersection and line-of-sight conditions.
Calle Colina and Calle Sacramento are both Local Residential Streets, with Calle Sacramento having relatively high traffic compared to other similar local residential streets. This intersection is also heavily used by bicyclists, because Calle Sacramento is part of the California State Bike Route through the City.
The intersection currently accommodates north-south movements on Calle Sacramento, a northeast-bound approach on Calle Colina, and a westbound approach on Avenida Hacienda. Traffic control is currently mixed: Calle Sacramento operates under free-flow control, Calle Colina is yield-controlled, and Avenida Hacienda is stop-controlled.
Discussion:
This report outlines the findings and recommendations regarding the proposed Stop Sign improvements at the four-way intersection of Calle Colina, Calle Sacramento, and Avenida Hacienda. Staff performed a Stop Control Warrant Analysis, which reviewed the number of traffic accidents at the intersection. Based on field investigations, staff found that the offset alignment of the four-way intersection may at times confuse local motorists and visitors who frequent the area. Although this intersection did not meet the accident criteria for the Stop Control Warrant, the line of sight and confusion at the offset intersection justifies new signage and pavement striping.
The proposed modifications are shown in Attachment 2 and include installing a new stop sign ahead sign, a new stop sign with stop bar, extending the existing centerline on Calle Colina, and new pavement markings to improve traffic flow. The estimated cost to complete the work is $2,000.
Staff notified residents within a 300-foot radius of the project area about the meeting and informed them that the modifications would be considered at the October 7, 2026 Planning Commission meeting and the City Council meeting on November 10, 2026.
Considerations Identified by Staff:
The proposed signage and striping modifications will improve the intersection's visibility and safety. The Planning Commission reviewed the improvements on October 7, 2026, and recommended moving the item to City Council for consideration.
Not making modifications to the intersection will continue the potentially confusing intersection for local and visiting motorists entering and navigating through the intersection.
Council Options:
• Adopt Resolution No. 26-190, approving the new signage and pavement striping modifications as shown on Attachment 2 and finding the project categorically exempt from CEQA.
• Adopt Resolution No. 26-190 with modifications.
• Continue the Item and provide Staff with alternative direction.
• Do not adopt Resolution No. 26-190 and deny the request for parking modification.
Environmental Review/Analysis:
This project is categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301.k) of the State CEQA Guidelines.
Fiscal Impact:
The total estimated construction cost of $2,000 is within the approved 2027 As-Needed Pavement Repairs budget from the Street Improvement Fund, Account No. 042-848-43420-000-27316
Potential Action(s):
If the City Council concurs with the contents of the staff report, it would be appropriate to adopt Resolution No. 26-190, which would:
1. Find the sign and striping modifications at the intersection of Calle Colina, Calle Sacramento, and Avenida Hacienda from a yield condition to a stop sign condition categorically exempt from the California Environmental Quality Act (CEQA) under Section 15301, Class 1 (Existing Facilities) of the State CEQA Guidelines; and
2. Approve the new signage and striping modification (Attachment 2) located at the intersection of Calle Colina, Calle Sacramento, and Avenida Hacienda and authorize staff to move forward with the modifications to install the new signage and pavement striping.
recommendation
end
Attachment:
1. Resolution No. 26-190
2. Location Map/Modification Plan
3. Stop Control Warrant
Notification:
Hearing notices were hand-delivered to residents within a 300-feet radius of the project area.