Submitted By: Public Works
Prepared By: Ray Pantoja, Water Conservation Analyst
Subject:
title
PUBLIC HEARING REGARDING THE ADOPTION OF THE CITY OF SAN CLEMENTE URBAN WATER MANAGEMENT PLAN AND WATER SHORTAGE CONTINGENCY PLAN; AND FINDING BOTH PLANS STATUTORILY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
body
Summary:
Staff recommends that the City Council adopt the 2025 Urban Water Management Plan (UWMP) and the 2025 Water Shortage Contingency Plan (WSCP).
Background:
The City of San Clemente’s 2025 UWMP has been prepared in accordance with the requirements of the California Water Code (CWC) Sections 10610 through 10657 of the Urban Water Management Planning Act (UWMP Act). Water suppliers with more than 3,000 customers or that supply more than 3,000 acre-feet of water annually are required to prepare, adopt, and file a UWMP with the California Department of Water Resources (DWR) every 5 years. San Clemente has been preparing and adopting the report since December 1985, with the last update in 2020.
The current CWC also requires the City, as a water supplier with more than 3,000 customers, to develop and adopt a standalone Water Shortage Contingency Plan (WSCP). The WSCP is a detailed plan that enables the City to manage water shortages at varying levels. This document was previously embedded in the 2020 UWMP and has been updated to reflect all relevant demand-reduction, supply-augmentation, and operational-adjustment actions that the City intends to implement at each prescribed level of water shortage should that become necessary.
Discussion:
In accordance with CWC Sections 10608.26 and 10642, and Government Code Section 6066, a Notice of a Public Hearing regarding the City’s 2025 UWMP and WSCP (Attachment 1) was published within the jurisdiction of the City of San Clemente on May 21 and May 28, 2026, and the referenced Public Hearing is being held today to provide members of the public and other interested entities with the opportunity to be heard in connection with the proposed adoption of both plans. The plans were also posted on the City’s website and timely sent to the Municipal Water District of Orange County and other local water agencies. The following are highlights of each of the two documents proposed to be adopted:
2025 UWMP:
The UWMP (Exhibit A to Attachment 2) benefits local agencies and the DWR by evaluating water planning at the regional and statewide levels. It details past, present, and future water demand trends and compares the data with current and potential water supplies in five-year increments over the next 25 years. Specifically, it analyzes supply reliability under three hydrologic conditions: a normal year, a single dry year, and multiple dry years. The City receives the majority of its potable water from the Metropolitan Water District (MET) via a regional distribution system, and MET has determined in its 2025 Regional UWMP that it can meet full service demands with existing supplies from 2025 through 2050 during normal, single-dry, and multiple-dry years. Therefore, the City’s UWMP also finds that through 2050, the City will meet its customers' water demands.
The UWMP also includes information on the City’s demand-management measures, water-loss control efforts, and recycled-water availability. The dedication of the City’s customers to conservation efforts, along with the expansion of the City’s recycled water system and the corresponding conversion of irrigation customers to recycled water, continues to reduce the City's reliance on imported water.
2025 WSCP:
The WSCP (Exhibit A to Attachment 3) serves as the operating manual that the City will use to prevent catastrophic disruptions in water service through proactive drought responses. The WSCP outlines a DWR requirement to prepare an Annual Water Supply and Demand Assessment, as well as the protocols to be implemented if a potential shortage is identified. The primary mechanisms identified in the WSCP for addressing predicted or sudden water shortages include demand reduction, supply augmentation, and operational adjustments. Since the City relies heavily on MET for imported water supplies, and it already implements a water loss control program on the operational side, demand-reducing shortage response actions are the most locally impactful of these three mechanisms. Thus, the WSCP lays out the appropriate water-conserving restrictions to be imposed on the City’s water customers for each of the five progressively severe levels of a declared water shortage. These levels and restrictions are consistent with Chapter 13 of the City’s Municipal Code, specifically its current Water Rates and Charges and Water Conservation Ordinance.
Considerations Identified by Staff:
Per CWC Sections 10610 through 10656, the City of San Clemente’s 2025 UWMP and 2025 WSCP have been prepared in accordance with the requirements of the UWMP Act. It is important to note that the UWMP Act requires every urban water supplier that provides municipal and/or industrial water to more than 3,000 customers (or supplies more than 3,000 acre-feet per year) to prepare and subsequently adopt a UWMP and WSCP every five years in order to be eligible for state grant funding and/or financial assistance. If the Council fails to adopt the UWMP and WSCP by the July 1 deadline set by the UWMP Act, the City could forfeit future opportunities for State grant funding and financial assistance.
The UWMP does not include any new water supply sources or expansion of the existing system, with one exception: a recently constructed recycled water line in Camino Vera Cruz will allow the connection of several new services, ranging from potable to recycled water.
Council Options:
• Adopt Resolution No. 26-110 (Attachment 2) and Resolution No. 26-111 (Attachment 3), adopting the 2025 Urban Water Management Plan (UWMP), and the 2025 Water Shortage Contingency Plan (WSCP), respectively, and finding the actions statutorily exempt from the California Environmental Quality Act in accordance with California Water Code Section 10652.
• Modify and adopt Resolution No. 26-110 and/or Resolution No. 26-111.
• Continue the item and direct staff to provide additional information. Note that delaying this item would prevent the City from meeting its regulatory deadline for adopting the UWMP and WSCP by July 1, 2026, unless a special meeting is held.
Environmental Review/Analysis:
The proposed City Council actions to adopt the 2025 UWMP and the 2025 WSCP are statutorily exempt from CEQA under California Water Code Section 10652 for the preparation and adoption of UWMP’s and WSCP’s. A Notice of Exemption (NOE) is being prepared by staff and will be filed within five days of adoption of the UWMP and WSCP.
Fiscal Impact:
None, if the plans are adopted by June 30, 2026. If not, the City could face:
• Fines of up to ($1,000) per day: Under California Water Code Section 1846, entities that fail to file required reports or violate regulations adopted by the State Water Board can face civil liabilities up to this maximum daily amount.
• Loss of State Funding: Ineligible for crucial state water grants and loans. To qualify for DWR and State Water Board financial assistance, a supplier’s UWMP must be formally adopted, submitted, and deemed complete by the DWR.
Potential Action(s):
recommendation
If the City Council concurs with the information provided within this staff report, the appropriate action would be to adopt Resolution Nos. 26-110 and 26-111, which would:
1. Find the adoption of the City of San Clemente 2025 Urban Water Management Plan and the adoption of the City of San Clemente 2025 Water Shortage Contingency Plan statutorily exempt from CEQA in accordance with California Water Code Section 10652;
2. Adopt the City of San Clemente 2025 Urban Water Management Plan; and
3. Adopt the City of San Clemente 2025 Water Shortage Contingency Plan.
end
Attachment:
1. Notice of Public Hearing
2. Resolution No. 26-110 [with 2025 UWMP attached as Exhibit A] Adopting the City of San Clemente 2025 Urban Water Management Plan
3. Resolution No. 26-111 [with 2025 WSCP attached as Exhibit A] Adopting the City of San Clemente 2025 Water Shortage Contingency Plan
4. Notice Letters to local water agencies
5. Proof of Publication of Public Notifications
6. Presentation Slideshow (Carollo)
Notification:
14-day Public Notice was published in The SC Times and the 60-Day Agency Notifications were mailed to:
|
Municipal Water District of Orange County |
|
Orange County Public Works |
|
South Coast Water District |
|
Santa Margarita Water District |
|
City of San Juan Capistrano |
|
South Orange County Wastewater Authority |
|
County of Orange |