Legislation Details

File #: 26-294   
Type: Resolution Status: Passed
File created: 6/10/2026 In control: City Council
On agenda: 6/16/2026 Final action: 6/16/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH ALLIANCE DIVERSIFIED ENTERPRISES FOR THE MARQUITA SLOPE INTERIM RECONSTRUCT PROJECT NO. 21208 AND UNENCUMBER FUNDS
Attachments: 1. Att. 1 - Res 26-117.pdf, 2. Att. 2 - Notice of Completion.pdf, 3. Att. 3 - 2025 Resolution for Award, 4. Att. 4 - Location Map PN 21208

Submitted By: Public Works

Prepared By: Shawn Ryan, Deputy Public Works Director

 

Subject:

title

CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH ALLIANCE DIVERSIFIED ENTERPRISES FOR THE MARQUITA SLOPE INTERIM RECONSTRUCT PROJECT NO. 21208 AND UNENCUMBER FUNDS

body

 

Summary:

The City Council is being asked to consider adopting Resolution 26-117 (Attachment 1), accepting the work performed by Alliance Diversified Enterprises, Inc., related to the Marquita Slope Interim Reconstruct Project, filing a Notice of Completion (Attachment 2), and unencumber $455,000 from the project account number 054-476-45300-000-21208 which will in turn increase the Sewer Depreciation Reserve Fund Balance.

 

 

Background:

 

On August 11, 2025, the City Council awarded a construction contract to Alliance Diversified Enterprises, Inc. for the Marquita Slope Interim Reconstruct project (Attachment 3). This project was initiated with an Emergency Coastal Development Permit through the California Coastal Commission in order to protect the Linda Lane Pump Station.  The work consisted of installing caissons and tiebacks, and regrading the slope with geogrid reinforcement between soil layers.  Other work included dewatering, removal of an existing soldier-pile wall at the toe of the slope, and installation of sub-drains.

 

An estimated summary of the construction expenditures related to this NOC is provided below: 

 

Admin / Construction Management                                                                                      $            29,578

Engineering Design                                                                                                                                                      330,030

Legal                                                                                                                                                                                                                       17,677

Hydrauger Construction                                                                                                                                                        49,421

Landscape Architect                                                                                                                                                          7,380

Construction Contract                                                                                                                           2,363,193

Rail Pros Railroad Flagging                                                               137,273

Total Construction Cost                                                                                                                             $                     2,934,552

This project is scheduled to be fully completed significantly lower than the budgeted amount.  Staff is therefore recommending that $455,000 be unencumbered from the project account back to the Sewer Depreciation Reserve Balance.

 

Council Options:

•                     Adopt Resolution No. 26-117, which would accept the completed construction work for the Marquita Slope Interim Reconstruct Project, CIP Project No. 21208 and unencumber excess project funds.

 

•                     Adopt Resolution No. 26-117 with modifications.

 

•                     Continue the item with direction to provide additional information.

 

Environmental Review/Analysis:

Acceptance and filing of a notice of completion is not a project pursuant to CEQA.  The work undertaken was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities - 14 CCR §15301) of the State CEQA Guidelines.

 

Fiscal Impact:

The total project construction cost of $2,934,552 is within the approved project budget of $3,682,400, funded by the Sewer Fund Depreciation Reserve, Account No. 054-476-45300-000-21208.

 

With the work completed on the slope, staff is recommending that $455,000 be unencumbered from the project account back to the Sewer Depreciation Reserve Fund Balance.  The remaining balance of approximately $292,848 would remain in the project account for future landscaping and permitting work related to the Coastal Development Permit, which is currently under review by the Coastal Commission.   

 

Potential Action(s):

recommendation

If the City Council concurs with the contents of the staff report, appropriate actions include adopting Resolution No. 26-117, which would:

.re

1.                     Accept Marquita Slope Interim Reconstruct Project, CIP Project No. 21208, from Alliance Diversified Enterprises, Inc.

 

2.                     Authorize the City Clerk to execute and record the Notice of Completion for the construction work related to the Marquita Slope Interim Reconstruct, CIP Project No. 21208.

 

3.                     Approve and authorize the amount of $455,000 be unencumbered from the project Account No. 054-476-45300-000-21208 to return to the Sewer Fund Depreciation Reserve, Account No. 054-476-45000.

 

4.                     Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, Alliance Diversified Enterprises, Inc.

 

5.                     Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director in the amount of 25% of the total construction cost.

 

end

Attachments:

1.                     Resolution 26-117

2.                     Notice of Completion

3.                     Resolution dated August 11, 2025

4.                     Location Map

 

Notification:

None.