Legislation Details

File #: 26-252   
Type: Resolution Status: Passed
File created: 5/19/2026 In control: City Council
On agenda: 6/16/2026 Final action: 6/16/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE PICO / PRESIDIO DIP REPLACEMENT PHASE II, CIP PROJECT NO. 13411
Attachments: 1. Att. 1 - Resolution No. 26-115_PN 13411 Resolution.pdf, 2. Att. 2 - Notice of Completion.pdf, 3. Att. 3 - Staff Report dated December 9, 2025.pdf, 4. Att. 4 - Location Map.pdf

Department: Public Works

Prepared By: Jacob Ohana, P.E., Associate Civil Engineer               

 

Subject:

title

CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE PICO / PRESIDIO DIP REPLACEMENT PHASE II, CIP PROJECT NO. 13411

body

 

Summary:

The City Council is being asked to consider adopting Resolution 26-115 (Attachment 1), accepting the Pico / Presidio DIP Replacement Phase II, and filing a Notice of Completion (Attachment 2).

 

Background:

On December 9, 2025, the City Council awarded a construction contract to Big Ben, Inc. for the Pico / Presidio DIP Replacement Phase II project (Attachment 3). This project was initiated to replace the existing water pipeline, which has reached the end of its useful life. The work consisted of the construction of a new eight-inch water main and its associated appurtenances, such as gate valves, fire hydrants, fire service connections, combination air release valves, and customer water service connections located at the Gateway Village Plaza. At the conclusion of the project, Big Ben, Inc. completed roadway repairs and restored affected concrete pedestrian and vehicular pathways.

 

 

A summary of the total construction expenditures is provided below: 

 

Construction Management and Special Inspection               $      74,813

Construction                                                                             1,116,638

Total Construction Cost                                                         $ 1,191,451

 

 

 

Council Options:

•                     Adopt Resolution No. 26-115, which would accept the completed construction work for the Pico / Presidio DIP Replacement Phase II, CIP Project No. 13411.

 

•                     Adopt Resolution No. 26-115 with modifications.

 

•                     Continue the item with a direction to provide additional information.

 

Environmental Review/Analysis

Acceptance and filing of a notice of completion is not a project pursuant to CEQA.  The work undertaken was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities - 14 CCR §15301) of the State CEQA Guidelines.

 

Fiscal Impact:

The total project construction cost of $1,191,451 is within the approved construction budget of $1,382,284 from the Water Fund Depreciation Reserve, Account No. 052-466-45300-000-13411.

 

Potential Action(s):

If the City Council concurs with the information provided within this staff report, the appropriate action would be to adopt Resolution No. 26-115 , which would:

.re

1.                     Accept Pico / Presidio DIP Replacement Phase II, CIP Project No. 13411, from Big Ben, Inc.;

 

2.                     Authorize the City Clerk to execute and record the Notice of Completion for the completed Pico / Presidio DIP Replacement Phase II, CIP Project No. 13411;

 

3.                     Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, Big Ben, Inc.; and

 

4.                     Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director in the amount of 25% of the total construction cost.

recommendation

 

end

Attachment:

1.                     Resolution 26-115

2.                     Notice of Completion

3.                     Staff Report dated December 9, 2025

4.                     Location Map

 

Notification:

None.