Legislation Details

File #: 26-346   
Type: Resolution Status: Passed
File created: 8/4/2026 In control: City Council
On agenda: 8/18/2026 Final action: 8/18/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH ALLIANCE DIVERSIFIED ENTERPRISES FOR THE CALLE FRONTERA SEWER LIFT STATION SOIL STABILIZATION PROJECT, CIP PROJECT NO. 32201
Attachments: 1. Att. 1 - Resolution No. 26-139.pdf, 2. Att. 2 - Notice of Completion.pdf, 3. Att. 3 - Staff Report Constructin Award (1-20-2026).pdf

Submitted By: Public Works

Prepared By: Belgin Cuhadaroglu, P.E., Senior Civil Engineer

 

Subject:

title

CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH ALLIANCE DIVERSIFIED ENTERPRISES FOR THE CALLE FRONTERA SEWER LIFT STATION SOIL STABILIZATION PROJECT, CIP PROJECT NO. 32201

body

 

Summary:

The City Council is being asked to consider adopting Resolution 26-139 (Attachment 1), accepting the work performed by Alliance Diversified Enterprises, Inc. for the Calle Frontera Sewer Lift Station Soil Stabilization, CIP Project, PN 32201, and filing a Notice of Completion (Attachment 2). 

 

Background:

On January 20, 2026, the City Council awarded a construction contract to Alliance Diversified Enterprises, Inc. for the Calle Frontera Sewer Lift Station Soil Stabilization (CIP) Project No. 32201 (Attachment 3). The project included the installation of a foundation support system consisting of caissons and grade beams to stabilize the existing building, minimize future structural movement, and prevent deterioration and cracking of the wet well structure.

 

 

An estimated summary of the construction expenditures related to this NOC is provided below: 

Project Management & Admin                                                                                                               $          78,000

Geotechnical Feasibility Study                                                                                                                                   19,096

Engineering Design                                                                                                                                                      104,250

Construction Contract                                                                                                                              769,904

Construction Management & Inspection                                            109,200

Geotechnical Construction Support                                                     69,598

Total Construction Cost                                                                                                                             $                     1,150,048

Council Options:

                     Adopt Resolution No. 26-139, which would accept the completed construction work for the Calle Frontera Sewer Lift Station Soil Stabilization, CIP Project No. 32201.

 

                     Adopt Resolution No. 26-139 with modifications.

 

                     Continue the item with a direction to provide additional information.

 

Environmental Review/Analysis:

This Project was determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Section 15303 of the state CEQA Guidelines, Class 3 (New Construction or Conversion of Small Structures), 14 CCR Section 15303.

 

Fiscal Impact:

The total project construction cost of $1,150,048 is within the approved project budget of $1,900,000, funded from the Sewer Depreciation Reserve Fund, Account No. 054-476-43890-000-32201.

 

Potential Action(s):

recommendation

If the City Council concurs with the recommendations contained in this staff report, moving this item without modifications would result in adoption of Resolution No. 26-139, which would:

 

recommendation

1.                     Accept the Calle Frontera Sewer Lift Station Soil Stabilization, CIP Project No. 32201, from Alliance Diversified Enterprises, Inc.;

 

2.                     Authorize the City Clerk to execute and record the Notice of Completion for the completed Calle Frontera Sewer Lift Station Soil Stabilization, CIP Project No. 32201;

 

3.                     Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, Alliance Diversified Enterprises, Inc.; and

 

4.                     Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.

 

end

Attachment:

1.                     Resolution No. 26-139

2.                     Notice of Completion

3.                     Staff Report dated January 20, 2026

 

Notification:

None.