Legislation Details

File #: 26-424   
Type: Resolution Status: Passed
File created: 10/5/2026 In control: City Council
On agenda: 11/10/2026 Final action: 11/10/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR CATCH BASIN AND STORM DRAIN IMPROVEMENTS AT AVENIDA PRESIDIO AND CALLE MIGUEL, CIP PROJECT NO. 12003
Attachments: 1. Att. 1 - Resolution No. 26-182.pdf, 2. Att. 2 - Notice of Completion.pdf, 3. Att. 3 - Staff Report dated February 3, 2026 (without attachments).pdf

Submitted By: Public Works

Prepared By: Jacob Ohana, P.E., Associate Civil Engineer

 

Subject:

title

CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR CATCH BASIN AND STORM DRAIN IMPROVEMENTS AT AVENIDA PRESIDIO AND CALLE MIGUEL, CIP PROJECT NO. 12003

body

 

Summary:

Resolution 26-182 (Attachment 1) represents the Notice of Completion (Attachment 2) for the Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel, CIP Project No. 12003.

 

Background:

On February 3, 2026, the City Council awarded a construction contract to Torres Sanitation Systems Construction (TRS) to construct the improvements related to the Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel (Attachment 3).  The project scope and work included excavation and demolition of existing facilities, construction of new catch basins, construction of new drainage pipelines, manhole rehabilitation, and trench and pavement restoration.

 

 

During Construction

After Construction

 

An estimated summary of the project expenditures related to this Notice of Completion is provided below:

 

Project Management / Administration

$

12,500

Engineering Design

 

172,926

Construction Management/Inspection

 

68,580

Construction Contract

 

425,100

TOTAL

$

679,106

 

Council Options:

•                     Adopt Resolution No. 26-182, which would accept the completed Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel, CIP Project No. 12003.

 

•                     Modify and adopt Resolution No. 26-182.

 

•                     Continue the item with direction to provide additional information.

 

Environmental Review/Analysis:

This project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR Section 15301) of the State CEQA Guidelines.

 

Fiscal Impact:

The total project cost is within the approved project budget of $750,000 from the Local Drainage Facilities Fund, Account Number 033-834-45300-000-12003.

 

Potential Action(s):

recommendation

If the City Council concurs with the information provided within this staff report, moving this item without modifications would result in the adoption of Resolution No. 26-182, which would:

 

1.                     Accept the Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel, CIP Project No. 12003, from Torres Sanitation Systems Construction;

2.                     Authorize the City Clerk to execute and record the Notice of Completion for the Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel, CIP Project No. 12003;

3.                     Authorize the City Clerk to release the payment bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, Torres Sanitation Systems Construction; and

4.                     Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.

 

end

 

 

Attachment:

1.                     Resolution No. 26-182

2.                     Notice of Completion

3.                     Staff Report dated February 3, 2026 (without attachments)

 

Notification:

None.