Legislation Details

File #: 26-337   
Type: Report Status: Passed
File created: 8/3/2026 In control: City Council
On agenda: 8/18/2026 Final action: 8/18/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR FY 2026 MAJOR STREET MAINTENANCE AND FY 2026 PAVEMENT PRESERVATION PROGRAM, CIP PROJECT NOS. 26303 AND 26304
Attachments: 1. Att. 1 - Resolution No. 26-137.pdf, 2. Att. 2 - Notice of Completion.pdf, 3. Att. 3 - Staff Report dated February 3, 2026 (without attachments).pdf, 4. Att. 4 - Completed Streets List.pdf

Submitted By: Public Works

Prepared By: Masako Hennequin, P.E., Senior Civil Engineer

 

Subject:

title

CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR FY 2026 MAJOR STREET MAINTENANCE AND FY 2026 PAVEMENT PRESERVATION PROGRAM, CIP PROJECT NOS. 26303 AND 26304

body

 

Summary:

The City Council is being asked to consider Resolution 26-137 and Notice of Completion for the FY 2026 Major Street Maintenance and FY 2026 Pavement Preservation Program (Attachments 1 and 2, respectively).  

 

Background:

 

On February 3, 2026, the City Council awarded a construction contract to L.C. Paving & Sealing, Inc. to complete street maintenance and pavement restoration (Attachment 3). The contractor completed the following: grinding and repaving deteriorated pavement, removing and replacing curb and gutter, sidewalk, curb ramps, driveway approaches, and manhole cover and water valve can adjustments on various streets throughout the City as listed in Attachment 4.

 

An estimated summary of the project expenditures related to this NOC is provided below:

 

                     Project 26303

                     Project Management / Admin.                                                                                                         $                          2,500

                     Engineering Design                                                                                                                                                          8,068

Construction Contract                                                                                                                                        381,116

Construction Management / Inspection                                                                                                            31,120

Construction Materials                                                                                                                                                        1,940

                     Total                                                                                                                                                                                             $        424,744

 

                     Project 26304

Project Management / Admin.                                                                                                                       1,500

                     Engineering Design                                                                                                                                                            1,632

                     Construction Contract                                                                                                                                                     200,000

                     Construction Management / Inspection                                                                                        13,681

                     Total                                                                                                                                                                                             $        216,813

                                                                                                                                                                                                                  

Council Options:

                     Adopt Resolution No. 26-137, which would accept the completed FY 2026 Major Street Maintenance and FY 2026 Pavement Preservation Program, CIP Project Nos. 26303 and 26304.

 

                     Modify and adopt Resolution No. 26-137.

 

                     Continue the item with direction to provide additional information.

 

Environmental Review/Analysis:

This project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR section 15301) of the State CEQA Guidelines.

 

Fiscal Impact:

The total project cost of $641,557 is within the approved combined project budget of $800,000. A total of $424,744 in expenditures was within the $550,000 budget from the General Fund Account Number 001-416-45720-000-26303, and a total of $216,813 in expenditures was within the $250,000 budget from Account Number 001-416-45730-000-26304.

 

Potential Action(s):

recommendation

If the City Council concurs with the information provided within this staff report, moving this item without modifications would result in adoption of Resolution No. 26-137, which would:

 

1.                     Accept the FY 2026 Major Street Maintenance and FY 2026 Pavement Preservation Program, CIP Project Nos. 26303 and 26304, from L.C. Paving & Sealing, Inc.;

 

2.                     Authorize the City Clerk to execute and record the Notice of Completion for the FY 2026 Major Street Maintenance and FY 2026 Pavement Preservation Program, CIP Project Nos. 26303 and 26304;

 

3.                     Authorize the City Clerk to release the payment bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, L.C. Paving & Sealing, Inc.; and

 

4.                     Authorize the City Clerk to release the performance bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.

 

end

Attachment:

1.                     Resolution No. 26-137

2.                     Notice of Completion

3.                     Staff Report dated February 3, 2026 (without attachments)

4.                     Completed Streets List

 

Notification:

None.