Submitted By: Public Works
Prepared By: David Rebensdorf, Public Works Director/City Engineer
Subject:
title
CONSIDERATION OF A RESOLUTION APPROVING AND AUTHORIZING THE MAYOR TO EXECUTE AN AGREEMENT FOR SYSTEMWIDE FACILITIES FOR THE JOINT REGIONAL WATER SUPPLY SYSTEM
body
Summary:
The City’s imported potable water is conveyed through two pipelines and reservoirs known as the Joint Regional Water Supply System (JRWSS). The system provides potable water to South Orange County. There have been consolidations and 11 agreements for the system dating back to the 1960’s. Due to changes and additions of system, the JRWSS Committee determined a need for a Systemwide Agreement to allocate costs, such as, office and administrative building and inventory storage facilities located at the Bradt Reservoir site, Geographic Information System (GIS), and portions of the Supervisory Control and Data Acquisition (SCADA) System.
In addition, the proposed agreement establishes an allocation of systemwide costs based on asset value and agency ownership and a committee to govern the systemwide assets. In the past, the agencies agreed to use the percentage of overall Joint Transmission Main (JTM) ownership to establish the allocation for systemwide costs. The proposed change reflects a reasonable allocation of costs since the JTM represents one of three major segments of the system. The impact to the City is an allocation increase from 28.74% to 37.94%, reflecting an cost increase of $130,000 in FY 2026/27 from a total JRWSS operating budget of $1,608,751. The FY 2026/27 budget reflects JRWSS cost increases, staff will monitor the budget and costs to ensure there is adequate funding in the current and future years.
Background:
JRWSS is a regional water supply system for South Orange County comprised of approximately 40 miles of water transmission mains and two reservoirs with a total of 60 million gallons of storage. Phase one was built in the early 1960’s and phase two improvements included additional transmission mains and storage constructed in the 1980’s and early 1990’s by Tri-Cities Municipal Water District (TCMWD). The system conveys imported treated potable water from a Metropolitan Water District’s connection in Irvine, to water agencies serving communities from Irvine to San Clemente, including the California State Parks, San Onofre Nuclear Generating Station, and USMC Camp Pendleton in northern San Diego County.
In 2000, TCMWD consolidated with Coastal Municipal Water District (CMWD) and South Coast Water District was named the Designated Operator for the JRWSS. In 2001, CMWD consolidated with Municipal Water District of Orange County (MWDOC). JRWSS Member Agencies include the City of San Clemente, El Toro Water District, Irvine Ranch Water District, Moulton Niguel Water District, Santa Margarita Water District and South Coast Water District.
The governance of the JRWSS is currently comprised of 11 agreements among 14 parties (some of which no longer exist), which include the above six Member Agencies, federal, state, and private utilities in two counties. The agreements were entered for the continued construction, operations and maintenance of specific JRWSS facilities such as the Joint Transmission Main (JTM), the Local Transmission Main (LTM), the Water Importation Pipeline (WIP), the San Onofre Feeder (SOF), Bradt Reservoir, and Schlegel Reservoir.
In the past few years, South Coast Water District initiated a review of all the agreements to address conditions that have changed or were unforeseen when the original agreements were executed. Such conditions include a change in Member Agencies (via consolidations and transmission main capacity purchases), scope of administrative costs, and allocation of costs.
Since the existing agreements focused on specific JRWSS facilities with no agreement encompassing systemwide facilities, the need became apparent for an agreement to encompass such systemwide facilities and systemwide costs. Systemwide facilities include all assets and facilities that service all or multiple JRWSS facilities, but not a particular JRWSS facility. Specifically, the systemwide facilities include the office and administrative building and inventory storage facilities located at the Bradt Reservoir site, Geographic Information System (GIS), and portions of the Supervisory Control and Data Acquisition (SCADA) System.
Discussion:
In 2024, SCWD submitted a draft Agreement for the Systemwide Facilities for the Joint Regional Water Supply System (Systemwide Agreement) to the Member Agencies for consideration. At a series of JRWSS Quarterly and special meetings, the Member Agencies, including finance staff and legal counsel for the Member Agencies, provided edits and comments.
Important provisions within the Systemwide Agreement are regarding:
• Systemwide Costs: Establishment of systemwide costs and allocation of systemwide costs among the Member Agencies
• Systemwide Committee: Establishment of an administrative committee (Systemwide Committee) to govern the systemwide costs and systemwide facilities
• Finance: Establishment of systemwide budget, accounting, reporting and insurance requirements, and limitation of liability and indemnification.

On August 12, 2026, after numerous discussions, revisions, and collaboration, the JRWSS Member Agency Committee acted (1) to adopt the final draft version of the Systemwide Agreement and recommend the finalized version of the Systemwide Agreement for approval to their respective governing bodies; and (2) for the Member Agencies to agendize the finalized version of the Systemwide Agreement, subject to any clarifying edits, from their governing bodies to consider approval before the next quarterly meeting of the JRWSS on November 12, 2026.
In accordance the two Committee actions, staff presents the attached Systemwide Agreement for consideration to approve. While the Systemwide Agreement is considered for approval by the governing bodies of all Member Agencies. Next steps include a review and update of the Amended and Restated Agreement for the Joint Transmission Main to better reflect current conditions and future use.
Considerations Identified by Staff:
The JRWSS system is comprised of critical assets providing imported potable water to San Clemente’s water service area and to South Orange County. South Coast Water District has provided service for the system and communicates on a daily basis with Public Works Utility staff regarding water quality, maintenance activities and quantity of water needed for City customers. Unfortunately, the original agreements did not consider general systemwide expenses, operation and previously they were agreed to be distributed based on JTM ownership which is only one pipeline segment of the system.
The City has capacity and ownership in the majority of the system assets since the City is at or near the end of the system, as a result, the City’s systemwide allocation increases from 28.74% to 37.94% as proposed in the attached Systemwide Agreement. The cost allocation as presented is based on an assessment of each agency’s asset value and ownership percentage to determine the percentage of systemwide allocation. In all fairness, each agency should pay its appropriate share of expenses related to the assets.
Council Options:
• Adopt Resolution No. 26-194 (Attachment 1), approving and authorizing the Mayor to execute an Agreement for Systemwide Facilities for the Joint Regional Water Supply System, subject to non-substantive changes approved by the City Attorney.
• Modify and adopt Resolution No. 26-194.
• Continue the item and direct staff to provide additional information.
• Do not adopt Resolution No. 26-194.
Environmental Review/Analysis:
Approval and execution of an agreement for cost sharing is not a “project” under CEQA Guidelines because the act of adding an agreement to clarify expense distribution is a legal and administrative action, not an activity that causes a physical change in the environment.
Fiscal Impact:
JRWSS cost increases were approved as part of the City’s FY 2026/27 and FY 207/28 Budget. It was also accounted for as part of the City’s water rates through the Water Cost of Service Study, completed in late 2025.
The City’s operating budget for JRWSS in FY 2026/27 is estimated at $1,608,800, reflecting an approximate increase of $130,000 due to the allocation adjustment. Staff will monitor the budget and costs to ensure there is adequate funding in the current and future fiscal years.
Potential Action(s):
recommendation
If the City Council concurs with the contents of the staff report, it would be appropriate to adopt Resolution No. 26-194, which would Approve and Authorize the Mayor to execute an Agreement for Systemwide Facilities for the Joint Regional Water Supply System, subject to non-substantive changes approved by the City Attorney.
end
Attachment:
1. Resolution No. 26-194
2. Draft Agreement for Systemwide Facilities for the Joint Regional Water Supply System