Submitted By: Public Works
Prepared By: Dustin Burnside, Utilities Manager
Julie Schmidt, Sr. Management Analyst
Subject:
title
CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH JENNETTE COMPANY, INC. FOR THE WATER RECLAMATION PLANT SOLIDS HANDLING BUILDING CENTRIFUGE CONVEYOR MODIFICATIONS, CIP PROJECT NO. 23203
body
Summary:
The Proposed Resolution 26-181 (Attachment 1) would accept the work performed by Jennette Company, Inc. for the Water Reclamation Plant (WRP) Solids Handling Building Centrifuge Conveyor Modifications, CIP Project 23203, and filing a Notice of Completion (Attachment 2).
Background:

Jennette Company, Inc. completed the construction contract (Attachment 3) for the Water Reclamation Plant Solids Handling Building Centrifuge Conveyor Modifications. The Centrifuge Conveyor System in the Solids Handling Building delivers dewatered sludge to storage containers for disposal. Regular and uninterrupted operation of this conveyor system is essential to avoid sludge pile-up or backups that can impact plant operations. The Project included removing a damaged segment of the essential sludge conveyor system and replacing it with a newly designed conveyor system layout that is more robust and less prone to the previous type of failure. An existing 2-inch S.S. pipeline in the Solids Handling Building was rerouted to supply potable water as “Seal Water” for the centrifuge system, helping prevent premature equipment failure.
A summary of the total construction expenditures is provided below:
|
Construction Management, Inspection |
$ 12,500 |
|
Construction |
$170,210 |
|
Total Project Cost |
$182,710 |
All work was completed to the satisfaction of the Public Works Director.
Council Options:
• Adopt Resolution No. 26-181 (Attachment 1), which would accept the completed construction work for the WRP Solids Handling Building Centrifuge Conveyor Modifications Project, CIP Project No. 23203.
• Adopt Resolution No. 26-181 with modifications.
• Continue the item with direction to provide additional information.
Environmental Review/Analysis:
This Project was determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Section 15301 of the state CEQA Guidelines, Class 1 (Existing Facilities), 14 CCR Section 15301.
Fiscal Impact:
The total construction cost of $170,210 is within the approved project budget of $185,000 from the Sewer Fund Depreciation Reserve, Account No. 054-476-43420-000-23203.
Potential Action(s):
recommendation
If the City Council concurs with the contents of this report, moving this item without modifications would result in adoption of Resolution No. 26-181, which would:
1. Accept the WRP Solids Handling Building Centrifuge Conveyor Modifications Project, CIP Project No. 23203, from Jennette Company, Inc.;
2. Authorize the City Clerk to execute and record the Notice of Completion for the completed WRP Solids Handling Building Centrifuge Conveyor Modifications Project, CIP Project No. 23203; and
3. Authorize the City Clerk to release the Payment Bond 35 days from the recordation of the Notice of Completion upon verification with the Engineering Division that no liens have been levied against the Contractor, Jennette Company, Inc.; and
4. Authorize the City Clerk to release the Performance Bond for this project upon receipt of a warranty bond in a form acceptable to the Public Works Director/City Engineer in the amount of 25% of the total construction cost.
end
Attachments:
1. Resolution No. 26-181
2. Notice of Completion
3. Staff Report dated July 17, 2024
Notification:
None.