Submitted By: Public Works
Prepared By: Jacob Ohana, P.E., Associate Civil Engineer
Subject:
title
CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR CATCH BASIN AND STORM DRAIN IMPROVEMENTS AT AVENIDA PRESIDIO AND CALLE MIGUEL, CIP PROJECT NO. 12003
body
Summary:
Resolution 26-182 (Attachment 1) represents the Notice of Completion (Attachment 2) for the Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel, CIP Project No. 12003.
Background:
On February 3, 2026, the City Council awarded a construction contract to Torres Sanitation Systems Construction (TRS) to construct the improvements related to the Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel (Attachment 3). The project scope and work included excavation and demolition of existing facilities, construction of new catch basins, construction of new drainage pipelines, manhole rehabilitation, and trench and pavement restoration.
During Construction
After Construction
An estimated summary of the project expenditures related to this Notice of Completion is provided below:
Project Management / Administration
$
12,500
Engineering Design
172,926
Construction Management/Inspection
68,580
Construction Contract
425,100
TOTAL
$
679,106
Council Options:
Adopt Resolution No. 26-182, which would accept the completed Catch Basin and Storm Drain Improvements at Avenida Presidio and Calle Miguel, CIP Project No. 12003.
Modify and adopt Resolution No. 26-182.
Continue the item with direction to provide additional information.
Environmental Review/Analysis:
This project was previously determined to be categorically exempt from the California Environmental Quality Act (CEQA) under Class 1 (Existing Facilities, 14 CCR Section 15301) of the State CEQA Guidelines.
Fiscal Impact:
The total project cost is within the approved project budget of $750,000 from the Local Drainage Facilities Fund, Account ...
Click here for full text