Legislation Details

File #: 26-404   
Type: Resolution Status: Passed
File created: 9/18/2026 In control: City Council
On agenda: 11/10/2026 Final action: 11/10/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO PANTHEON DIVERSIFIED, INC. FOR LIFEGUARD TOWERS REPLACEMENT (2026), CIP PROJECT NO. 17144, AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT IN THE AMOUNT OF $82,998, AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
Attachments: 1. Att. 1 - Resolution No. 26-185.pdf, 2. Att. 2 - Construction Contract.pdf, 3. Att. 3 - Location Plan (Admin Report).pdf, 4. Att. 4 - Bid Protest letter.pdf, 5. Att. 5 - Bid Protest Response Letter.pdf, 6. Att. 6 - Pantheon Diversified Inc. bid.pdf, 7. Att. 7 - Capo A General Contracting bid.pdf, 8. Att. 8 - Pantheon Diversified Inc. Affidavid for digital signature.pdf
Submitted By: Public Works
Prepared By: Belgin Cuhadaroglu, Senior Civil Engineer

Subject:
title
CONSIDERATION OF A RESOLUTION AWARDING A CONSTRUCTION CONTRACT TO PANTHEON DIVERSIFIED, INC. FOR LIFEGUARD TOWERS REPLACEMENT (2026), CIP PROJECT NO. 17144, AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT IN THE AMOUNT OF $82,998, AND FINDING THE PROJECT CATEGORICALLY EXEMPT FROM THE CALIFORNIA ENVIRONMENTAL QUALITY ACT
body

Summary:
The proposed Resolution (Attachment 1) would award a construction contract to Pantheon Diversified, Inc., in an amount not to exceed $82,998 (Attachment 2), to replace two Lifeguard Towers that are nearing the end of their useful life.

Background:
San Clemente beaches accommodate approximately 2.6 million visitors each year. Marine Safety has responsibility for providing beach safety and water-related lifeguard services. To maintain and improve emergency response, staff use lifeguard towers for better visibility and to store safety equipment. Currently, lifeguards utilize 11 towers: ten wooden and one fiberglass. This is the third phase of tower replacements: six out of 11 towers 1, 3, 4, 5, 6, and 7) were replaced in 2024 and 2025.

/

The new replacement towers are being constructed from wood to improve safety and address challenges in obtaining replacement parts for fiberglass towers. This will follow the construction of the previous six towers built in 2024 and 2025. This project proposes to replace towers eleven (11) and fourteen (14), which are nearing the end of their useful life. Photos of the recently constructed towers in 2025 are shown below.
/


Discussion:
On August 27, 2026, City staff conducted a formal bid for replacing the two lifeguard towers, notified local contractors, and advertised the project for competitive bidding on the PlanetBids website and in the SC Times. The City received 11 bids, ranging from $82,998 to $460,919.50. Bids are tabulated in Table 1, Bid Summary, below:

Table 1. Bid Summary
Ve...

Click here for full text