Legislation Details

File #: 26-433   
Type: Contract Status: Passed
File created: 10/6/2026 In control: City Council
On agenda: 11/10/2026 Final action: 11/10/2026
Effective date:    
Title: CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH JENNETTE COMPANY, INC. FOR THE WATER RECLAMATION PLANT SOLIDS HANDLING BUILDING CENTRIFUGE CONVEYOR MODIFICATIONS, CIP PROJECT NO. 23203
Attachments: 1. Att.1 - Resolution No. 26-181.pdf, 2. Att. 2 - Notice of Completion.pdf, 3. Att. 3 - Staff Report dated July 17, 2024.pdf
Submitted By: Public Works
Prepared By: Dustin Burnside, Utilities Manager
Julie Schmidt, Sr. Management Analyst

Subject:
title
CONSIDERATION OF A RESOLUTION TO ACCEPT AND FILE A NOTICE OF COMPLETION FOR THE CONSTRUCTION CONTRACT WITH JENNETTE COMPANY, INC. FOR THE WATER RECLAMATION PLANT SOLIDS HANDLING BUILDING CENTRIFUGE CONVEYOR MODIFICATIONS, CIP PROJECT NO. 23203
body

Summary:
The Proposed Resolution 26-181 (Attachment 1) would accept the work performed by Jennette Company, Inc. for the Water Reclamation Plant (WRP) Solids Handling Building Centrifuge Conveyor Modifications, CIP Project 23203, and filing a Notice of Completion (Attachment 2).

Background:
Jennette Company, Inc. completed the construction contract (Attachment 3) for the Water Reclamation Plant Solids Handling Building Centrifuge Conveyor Modifications. The Centrifuge Conveyor System in the Solids Handling Building delivers dewatered sludge to storage containers for disposal. Regular and uninterrupted operation of this conveyor system is essential to avoid sludge pile-up or backups that can impact plant operations. The Project included removing a damaged segment of the essential sludge conveyor system and replacing it with a newly designed conveyor system layout that is more robust and less prone to the previous type of failure. An existing 2-inch S.S. pipeline in the Solids Handling Building was rerouted to supply potable water as “Seal Water” for the centrifuge system, helping prevent premature equipment failure.

A summary of the total construction expenditures is provided below:

Construction Management, Inspection
$ 12,500

Construction
$170,210

Total Project Cost
$182,710


All work was completed to the satisfaction of the Public Works Director.

Council Options:
Adopt Resolution No. 26-181 (Attachment 1), which would accept the completed construction work for the WRP Solids Handling Building Centrifuge Conveyor Modifications Project, CIP Project No. 23203.